Extrusion International USA 4-2020
42 Extrusion International 4/2020 PIPE EXTRUSION The scarcity of water that the Span- ish southeast suffers persistently and the insufficient efficiency of the current irrigation system has deter- mined that the Irrigation Community has approved the substitution of the Project for theModernization of the Regable Area of the Irrigation Community of the Tajo – Segura Transfer – Librialla. Sector 2 Modernization Project Irrigation area of the irrigation community of the Tajo-Segura de Librilla transfer. Sector 2 Installation of PVC-O pipes in the modernization project of the irrigation area of the irrigation community of the Tajo-Segura transfer of Librilla sary for the proper functioning of the drip irrigation that will be installed in each of them. The installation will start in each Sec- tor from a regulation reservoir, which in Sector 2 has been the subject of a separate project and was carried out and financed by the aforementioned Ministry, which will be supplied from the corresponding automated in- takes of the TTS Channel. Its scope is located entirely in the mu- nicipality of Librilla (Murcia). The irrigation before the execution of the works was by flooding in 45% of the irrigable area and was orga- nized from five intakes on the TTS Canal. The water poured into chan- nels that, varying in section, consti- tuted a network of ditches that car- ried the water to each of the plots. The other 55% have high-frequency irrigation installed, with a starting point in a particular reservoir, where irrigation canal network, for another one under pressure, buried, formed by pipes of different materials, diam- eters and pressures, that is capable of serving the flow of filtered and measured water in each farm, neces- Area Impulsion 219,4 has Gravity 660,2 has Total sector 2 879,6 has
Made with FlippingBook
RkJQdWJsaXNoZXIy ODIwMTI=