230706Zumbach Rayex S Online Ad 368x250pxEN

VM
en English arrow
de Deutsch
ch 中國
Tags

Guill multi productsbanner smartextrusion 12 24

New Issue

Extrusion 8-2024

16.12.2024

Extrusion 8-2024

CPS25 VMVerlag 368x120 EN

EMP25 VMVerlag 368x120 EN

online control Banner Feb 2022 2

Логотип сайта
Entek to build a separator film plant in Indiana

Entek to build a separator film plant in Indiana

News 25.03.2023
Terre Haute 01 1280x1139
ENTEK CEO Larry Keith and ENTEK Manufacturing President Kim Medford with Indiana state officials

ENTEK, a US-owned and US-based producer of ‘wet-process’ lithium-ion battery separator materials, headquartered in Lebanon, Oregon, announced plans to establish operations in Indiana, investing $1.5 billion in a new Terre Haute production facility. The project, which marks the company’s largest investment thus far, will create up to 642 new, high-wage jobs by the end of 2027 and support the growing electric vehicle (EV) industry in Indiana and across the United States.

ENTEK will establish operations on a 340-acre greenfield site in the Vigo County Industrial Park II in Terre Haute. The company plans to initially construct four buildings covering approximately 1.4 million square feet – equipped with equipment built at current ENTEK manufacturing facilities in Oregon and Nevada and including specialty biaxial stretching equipment supplied by Brueckner Group USA – to manufacture battery separators for lithium-ion battery manufacturers across the United States.

ENTEK’s site selection was focused on choosing both land and community. Larry Keith, ENTEK’s CEO, said, “We chose Terre Haute for many reasons including the excellent workforce opportunity, the incredible support provided by Steve Witt and the Economic Development Corporation, a nearly shovel ready construction site with available utilities located in an industrial park, excellent vocational education, and the business-friendly incentives from both the state and local governments.”

The campus, which will be fueled in part by a $200 million grant from the U.S. Department of Energy (DOE) as part of the recent Bipartisan Infrastructure Law, will help ENTEK to scale its U.S. production, capable of supplying 1.4 to 1.6 million EVs annually by 2027. The new giga-scale lithium-ion battery separator operations will leverage ENTEK’s pioneering sustainable, state-of-the-art solvent extraction and recovery systems and processing techniques, and the company will work to utilize available renewable energy with a focus on a reduced carbon footprint. The company plans to break ground on the campus as soon as engineering and permitting is completed and launch its Indiana operations between 2025-2027.

This project is the first phase of ENTEK’s planned expansion to produce about 1.4 billion square meters of ceramic coated lithium separators across its operations. Phase 2 of the project will add up to an additional 1.8 billion square meters of battery separator produced annually for a total of 3.2 billion square meters which will provide enough separators for about 3.5 million electric vehicles.

sm242x60

Extrusion 242 60

Extrusion-International 242x60

Our website makes use of cookies to ensure we give you the best experience on our website.
By continuing browsing on our website you give your consent to our use of cookies.